Treatment Plants & Operational Facilities
Operations BuildingWater Treatment Plant
The water supply for MWSD customers is drawn from the East Fork Stones River and from Percy Priest Reservoir.

The plant operates 24 hours per day, every day of the year, and consistently produces finished water that meets or exceeds all state and federal criteria for drinking water quality.

The Stones River Water Treatment Plant has the capacity to treat 20 million gallons per day of drinking water. On an average day, over 10 million gallons of drinking water is softened, disinfected, filtered and fluoridated. The plant features state-of-the-art equipment such as 0.1 micron membrane filtration, granular activated carbon contactors and onsite hypochlorite generation for improved water quality.

Distribution System & Storage
The distribution system has the capacity for storage of twelve million gallons. This storage helps to maintain the pressure in the system, fire protection and is available even during power outages.

Annual Water Quality Report
The purpose of this water quality report is to provide you with information regarding your drinking water. We want to keep you informed about the water and services that we have delivered to you over the past year and we are pleased to provide you with the 2015 Annual Water Quality Report.

Wastewater Treatment Plant
A new waste water treatment plant was placed in operation in 2000. This plant utilizes a biological process to convert pollutants to settable solids, which are then removed by settling, then de-watered and sent to the landfill. The water is then filtered, disinfected by ultraviolet light, and aerated before discharge to the West Fork Stones River. The resulting reclaimed water is of very high quality, on par with drinking water standards of the 1970's.

Reclaimed Water
Reclaimed water is utilized on-site at the treatment plant for irrigation and for plant process water. A 24-inch reuse water line has been installed from the plant to Broad Street to make this resource available for other uses.

Operations & Maintenance
Personnel operating from this location deal with all aspects of the potable water distribution and sewage collection systems. This includes line construction and repair, making taps for both water and sewer services, and inspection and maintenance of nearly 700 miles of pipelines.

The most efficient and cost effective methods are utilized to maintain the system. Trenchless technology, including the use of underground television cameras to inspect pipe and locate breaks, and underground boring devices, is used on a daily basis to minimize disruptive and costly digging.

Emergencies
Although the normal working hours at this location are from 7 a.m. to 4 p.m., workers are on call at all times to respond to emergency needs.

Water Complaint Form

Contact Us
Alan Cranford
Water Treatment Plant Manager
Email

5528 Sam Jared Drive
Murfreesboro, TN 37130

Phone: (615) 848-3222
Fax: (615) 848-3244

John Strickland
Wastewater Plant Manager
Email

2032 Blanton Drive
Murfreesboro, TN 37129

Phone: (615) 848-3225
Fax: (615) 895-1241

Donald Hughes
Assistant Operations Manager
Email

Jimmy Stacey
Assistant Operations Manager
Email

1725 South Church St.
Murfreesboro, TN 37130

Phone: (615) 893-1223
Fax: (615) 893-2153
Kayaks